Building a house in Varna House construction
January 2026 23/01/2026
Building a house in Varna 
Construction company Varaks continues the building works of this house in Varna with pouring concrete for the walls to an elevation of ±0.00. The concrete is poured in stages with a concrete pump, evenly distributed, then vibrated to ensure the necessary density and strength. The upper edge of the walls is precisely leveled and smoothed. The care of the concrete guarantees the quality and durability of the structure and once again distinguishes Varaks as an established and reliable building services company in Varna.
January 2026 19/01/2026
Building of a house in Varna
The building works of the rough construction of a single-family house in Varna continues on schedule. At this stage, the team of construction company Varaks is making shuttering for the slab at elevation ±0.00. High-quality three-ply formwork panels are being fitted, as well as formwork beams to support and strengthen the panels. The shuttering for the staircase is also being made. The construction workers are installing hydrophobic plywood, which is particularly suitable for operation during the winter months, due to its water resistance and ability to be used in a humid environment.
Beginning of the works 22/12/2025
Building and repair works of a school in Dobrich
Construction company Varaks begins the renovation works of the school in Dobrich with making of leveling floor screeding. The cement screed has been delivered and unloaded by the construction workers at the site and its laying has begun. Building works of the correction of the steps follows, which includes their shaping and re-grouting.
December 2025 18/12/2025
Construction of a house in Varna
The building works of the second part of this house in Varna continue with the construction of reinforced concrete walls up to elevation 0. After their construction, the building workers make shuttering and reinforcement for the slab at elevation ±0.00. This is followed by pouring of concrete, which completes the structural slab and prepares it for the next stages of construction.
December 2025 12/12/2025
Building a house in Balchik
In the current stage of the construction of this single-family house in Balchik, building company Varaks’ done basic construction and mounting works related to the facade and internal installations. A roof was built above the ground floor - our experienced construction workers first impregnated and then installed a wooden supporting structure. The fitting of the wooden boarding has also begun. Along with that, external thermal insulation with EPS panels (styrofoam) was fitted on the facade walls in order to increase the energy efficiency of the building. After the installation of the thermal insulation, facade plaster with support netting was applied, preparing the base for mineral plaster. Mineral wool was supplied for heat and noise insulation of the ceiling and roof of the house. Plumbing installation works in the bathrooms were also successfully completed, in accordance with all construction requirements and standards.
December 2025 08/12/2025
Building a house in Balchik, Rogachevo
At this stage of the construction of this house near Balchik, begins the applying of the render to the external walls of the building. Scaffolding has been assembled and the cement render is applied. 
The workers of construction company Varaks continue the internal works making decorative plaster on the walls of the living room and hallway. The bathroom door has been mounted and the bathroom is completely ready.
End of the works 03/12/2025
Construction and repair works of a house in Kavarna 
The interior and exterior renovations of this house in Kavarna have been completed. Tiles have been fitted on bathroom walls and floor. A linear siphon has been mounted for modern and functional drainage. High-quality thermal insulation has been fitted on the facade and mineral plaster has been applied, providing long-lasting protection and an aesthetic appearance.
The owners were extremely satisfied with the quality of the construction and repair works provided by construction company Varaks and expressed their desire to continue our joint work in the next stages of the project.