The owners of this property trusted Varaks Construction for the building of the rough construction of their house in Varna. The rough construction is the foundation on which all elements of the building are built, so it must be as stable and secure as possible. Varaks Construction company guarantees high quality and accuracy in the execution of construction works on the structure of the building.
The building works on the rough construction of this house in Varna include:
• Demolition of an existing building;
• Transport construction waste to a landfill;
• Excavation for foundations;
• Transport of earth to a landfill;
• Backfilling soil and compact;
• Shuttering works;
• Supply and fit of reinforcement;
• Supply and pour concrete;
• Brick masonry;
• Fit plumbing in the foundations - excavation by hand, supply and lay sand, backfilling - by hand, making a hole with a drill.
Building a house in Varna
The construction of the shuttring for the slab at elevation +3.20 continues, the workers of Varaks building company also made a complex shuttering for the double-sided visible steps of the staircase between the ground and the first floor. Complex reinforcement bars for the slab at elevation +3.20 and the staircase were prepared and fitted. The works on the formwork of the slab and beams at elevation +3.20 were highly complex, due to 4 different levels and slopes of the slab. The professionals from Varaks construction company completed all the work without a hitch. Part of the reinforcement of the slab is also the manufacture and fitting of a 12-meter metal beam, which is fitted between the reinforcement. The concrete for elevation +3.20 was poured and the work continued with the fitting of the shuttering for columns at elevation + 6.35.
Building a house in Varna
Construction company Varaks continues the building works of this house in Varna pouring the concrete for the concrete slab. The reinforced concrete columns have been built. The rough construction of the house in Varna continues with making shuttering for the staircase and the slab for the first floor. Wooden boards and ramps are mounted for access and safe passing between the sections.
Building a house in Varna
The building works of the rough construction of this house in Varna continue with backfill and compact soil and gravel. Thermal insulation has been fitted and reinforcement bars for the concrete slab has been fitted. The plumbers of construction company Varaks installed the water and sewage system.
Building a house in Varna
Construction company Varaks continues the building works of this house in Varna on schedule. Initial concrete base is poured and the reinforcement bars for the footings and concrete walls are fitted. Form oil is applied to the shuttering, to prevent sticking of the concrete to the formwork. The builders fitted the rebars and made all the shuttering forms. After that they started pouring the concrete. The construction workers vibrated and leveled the concrete.
Building a house in Varna
The building works on the rough construction of this house in Varna begin with the demolition of the old, existing building. The building rubbish is transported to a specialized landfill. The workers of Varaks construction company drew out the house, set the levels, set out the grade and begin the excavation work.