The project covers the building of rough construction of a house in Varna along with the reconstruction of the existing house, including an extension and strengthening of the structure. Construction company Varaks have done the following types of building works:
1. Demolition of the old house;
2. Excavate and prepare for the foundations:
Construction of a house in Varna
Building company Varaks continues the construction works of this house in Varna with backfill soil in foundations and compact with compaction plate. The concrete for the pavement at elevation -2.80 has been poured and reinforced concrete columns have been built. XPS thermal insulation is laid underneath. Then the shuttering has been done, the reinforcement has been fitted and the concrete for the concrete walls has been poured to elevation 0.00. Thanks to the professionalism of our team of construction workers, the construction and installation works of this project are progressing confidently. The concrete slab at elevation 0.00 has been built and the concrete for it has been poured. Due to the specifics of the project, next step is the demolition of the other old part of the old house.
Construction of a house in Varna
The building works of this house in Varna continue with the installation of shuttering for the footings and vertical elements. Construction company Varaks is also fitting the reinforcement - both vertical and horizontal bars have been placed, some of which are already tied into reinforcement cages. Professional geodetic equipment is being used on the site to determine elevations. The construction workers are stabilising the formwork and completing the reinforcement structures, preparing the construction site for the upcoming concrete pouring.
Construction of a house in Varna
Construction company Varaks continues the construction works on this new house in Varna. The demolition by hand of the old building has been completed and the works on the excavation for foundations has begin. The levels have been set. Access to the construction site is difficult and requires increased attention and high professionalism from the construction workers who deliver the materials and operate the equipment. Concrete has been poured before foundations. The fitting of the shuttering and reinforcement bars in strips has also begun.
Construction of a house in Varna
The construction works of this house in Varna begins with fencing off the property and installing the necessary signs. The construction workers from Varaks construction company dismantle the roof, then begins the demolition of the house.