The construction works near Albena include the implementation of the following external works:
- Concrete patio between the house and the pool - demolition of old concrete patio, load and carry of construction waste, excavation of the terrain by hand with thickness of 20 cm - excavation works to level the terrain;
- Construction of retaining wall - expansion of existing excavation - by hand, excavation for retaining wall foundations - by hand, supply and fit reinforcement N 10 in foundations, shuttering of the retaining wall, supply and pour concrete in foundations and in retaining wall with mixer-pump, backfill and ramming, leveling of the terrain around the pool, supply and lay polyethylene foil, supply and fit reinforcing grill f6, supply and pour concrete B-25 for concrete flooring with concrete-pump, construction of 3 steps (formwork, reinforcement, concrete);
- Drainage of the house - excavation for plumbing - by hand, supply and install of PVC pipe f110, incl. fittings and laying sand, backfilling with ramming;
- Making a wooden canopy - processing of wooden structure - beams and ribs, supply and install wooden structure and varnishing, fit new wooden boarding, varnish tongue and groove - double sided, fit tongue and groove and fit insulation between the ribs, supply and fit fascia - varnished on both sides, supply and lay bituminous primer on the boarding, supply and install foil and bitumen tiles, supply and fit gutters and downpipes, screed with thickness over 10 cm, strengthening the concrete beam on the terrace with metal structure, demolition of an existing iron column;
- Construction of concrete patio - demolition of concrete, earth excavation, ramming of layers every 20 cm and leveling the terrain, supply and lay of polyethylene foil, reinforcing grill F6 and concrete B-25 for pavement base with concrete pump, construction of a concrete patio with columns;
- Concrete structure for the garage roller blind, roof of the concrete structure - demolition of concrete wall and foundation, column of concrete bricks and concrete bricks, excavation 60/60/60 for concrete columns, formwork of concrete columns and beam, supply and fit reinforcement in beam and column bases, pour concrete for columns, beam and bases - made by hand, processing of wooden structure - beams and ribs, mount wooden structure, supply and fit tongue and groove and varnishing on both sides, supply and fit roofing foil and nailing of battens, supply and install roof and ridge tiles, supplt and and install of processed fascia.
The building works in village of Rogachevo have been completed. The glazed widnows, wooden shed is ready. The driveways to the parking lots have been completed. The structures in front of the garage and the parking lot are plastered.
The wooden barbecue shed is ready. The concrete blocks of the fence have been installed. The concrete caps of the fence and its columns have been fitted. Then the iron part of the fence is fitted and welded. Retaining wall formwork is made. The concrete structures in front of the garage and in the parking lot are finished. Measurements for the iron railing are taken.
The shuttering was made and the reinforcement was installed. The façade is covered with nylon sheets in order to stay clean when pouring concrete. As soon as the concrete is laid, it is vibrated to compact and spread evenly. Finally, after the concrete is set, it is grinded with a machine. The concrete structure for the gates has been poured. A fence is built with fence blocks. Construction of the wooden barbecue structure begins.
The demolition of concrete and old patios continues. The retaining wall is made. We level the terrain. Insulation of the house wall towards the retaining wall has been made. The screeding of the wooden canopy and the board are made by hand. The shuttering for the staircase is fitted. Inert materials and earth for the parking place are spread and rammed. The concrete for the ramp is demolished with drilling machine. The preparation for the retaining walls is on the go.
The building works near Albena continue. The concrete of two of the retaining walls has been poured. Drainage pipes have been laid and covered with sand. The reinforcement is fitted on the patio around the pool. The facade is wrapped with nylon before the concrete is poured. Then concrete is then poured on the patio around the pool with a concrete mixer-pump.
The works on this house near Albena begin with demolition of the old concrete patio. The building rubbish is loaded and removed. Then the pipes for the drainage are laid.