The construction of a retaining wall and a concrete path around this house in Balchik includes the following building works:
- Excavation for the foundations of the retaining wall;
- Hand leveling of the trench;
- Enclosing steel reinforcement of the retaining wall;
- Fitting construction plywood of the retaining wall;
- Pour concrete for the retaining wall;
- Level with excavator the ground for the concrete path;
- Lay polyethylene membrane for the concrete path;
- Fit steel mesh for the concrete path;
- Pour concrete for the concrete path.
The facing stone cladding for the retaining wall was delivered to the building site. The wall is primed, then the gneiss lining is fitted.
The concrete for the retaining wall is poured into the cast with a concrete mixer pump. The concrete for the concrete path is also poured and the surfaces there are protected from dirt with nylon and wooden board. Workers level the concrete and vibrate the concrete after laying.
Steel reinforcement is fixed for the foundations of the retaining wall. The polyethylene membrane and the reinforcement mesh for the concrete path are fitted. Then the concrete in the base of the retaining wall is poured and the reinforcing bars are enclosed with construction plywood which will make the cast for the concrete. The reinforcement mesh ends are wrapped. The plywood is processed with oil.
The works on the construction of the retaining wall in Balchik begin with a machine excavation for foundations. The terrain for the concrete path is leveled.