Industrial building

Construction of a gravel road at a photovoltaic power plant near Dobrich

Construction of a gravel road at a photovoltaic power plant near Dobrich

The construction works for the road within the photovoltaic power plant (PV plant) near Dobrich include:

  • Site clearing and route preparation – removal of vegetation and the topsoil layer from the road alignment, as well as clearing the relevant sections of waste and obstacles;
  • Shaping and grading of the road alignment – forming the required shape and width of the road and achieving a level and even surface;
  • Compaction of the road base prior to the placement of crushed stone;
  • Suppy and spreading of gravel – suppy, distribution and spreading of gravel along the road alignment and formation of the required layer;
  • Compaction of the gravel pavement using a vibratory roller – compacting and stabilizing the placed gravel.

Construction company Varaks carried out the construction of the road entirely for the needs of the photovoltaic power plant near Dobrich. The construction of the road is necessary to ensure reliable, year-round access to the photovoltaic power plant and to facilitate the operation, technical maintenance and repair of the facilities. The road will also provide access for specialized mechanization and emergency vehicles, when necessary.

Project details

  • Start Date:08.2026
  • Location:Dobrich
  • Category: Industrial building
  • ID:I-146