Industrial building

Construction of foundations for a photovoltaic power plant near Dobrich

Construction of foundations for a photovoltaic power plant near Dobrich

Varaks Construction Company completed the construction and installation works for the foundations of a new photovoltaic power plant near Dobrich. The project included the following construction activities:

  • Site preparation and temporary construction site organization;
  • Setting out and layout marking;
  • Mechanical and manual excavation for foundation pits in accordance with the required dimensions and elevations;
  • Transport excavated soil and preparation of the base (including leveling and compaction);
  • Backfill with gravel with subsequent compaction;
  • Supply and pour of blinding concrete;
  • Supply and fit waterproofing;
  • Supply and pour concrete with admixtures to enhance operational performance and structural durability;
  • Supply and fit complex reinforcement assemblies;
  • Formwork installation and removal;
  • Fabrication and installation of a precast concrete panel;
  • Installation of a galvanized steel cover;
  • Performance of laboratory quality control and testing;
  • Execution of all related transportation, loading/unloading and organizational activities necessary for the successful completion of the project.

The project was carried out with a strong focus on construction quality, adherence to project deadlines, and compliance with occupational health and safety regulations. Modern technologies and high-quality materials were employed to ensure the reliability, durability, and long service life of the facilities.

Project details

  • Start Date:06.2026
  • Location:Dobrich
  • Category: Industrial building
  • ID:I-143