Varaks Construction Company completed the construction and installation works for the foundations of a new photovoltaic power plant near Dobrich. The project included the following construction activities:
Building company Varaks began the construction of the foundations of a photovoltaic power plant near Dobrich by carrying out site layout marking. Following the surveying and staking-out works and the installation of batter boards, a mechanized excavation for the foundations was done.
Due to the excavation depth, the layout marking process was carried out in two stages. Initially, the upper excavation boundary was marked out, after which an additional layout marking was performed at the next level until the elevation specified in the project was reached.
This approach resulted in a double layout marking process, ensuring the required accuracy in the execution of the excavation works.