Building a swimming pool in Balchik
This luxurious swimming pool was built in 2011 in a property where building company "Varaks" was engaged to build it along with a villa. The pool is larger than the regular size for this kind of properties. It's dimensions are 10 x 5 meters.
It took 4 months to complete the building works of this swimming pool in Balchik. There are children section and steps available. The edge of the pool is decorated with elegant ceramic mosaic tiles for the perfect finish.
The construction of the swimming pool is finished. The pool size is 10 x 5 meters. It has children's section and stairs to get into and out of the pool. The decorative pool tiles on the edge are the perfect finishing touch of the project.
After the waterproof membrane is fit on walls, a contact primer was applied. Varaks' workers then fit the pool tiles. Border stones and decorative stones are also fit. Patio around the pool is completed.
Beginning of the works of the construction of Villa Vegas' swimming pool. After the excavation, the concrete base shell of the pool is cured. The shuttering of the steps and children's pool is taken off. The patio construction is on the way with waterproof membrane prior to concrete and rebar.