Building a swimming pool in Balchik
It was about time this spacious piece of land to be turned into a place to relax and enjoy the sunshine. As many owners of a summer villa, owners of villa Jasmine decided to build their own "escape from the heat".
Building company "Varaks" endeavor to fulfill their dream and started the construction of the swimming pool in Balchik as soon as possible - shuttering, reinforced concrete and many men did a great job. So, here it is the new Jasmine swimming pool with children’s section for the happiness of every age.
The glass-ceramic mosaic pool tiles have been installed and the site around the pool has been made with paving slabs. The pool is filled and operational for the summer of 2005.
The construction of a swimming pool in the villa zone Ovcharovski plazh near Balchik begins with sizing the terrain and excavation of earth masses by hand. Substrate concrete was then laid in the foundations. Shuttering for walls was made and reinforcement was laid. The work then continues with the laying of concrete. Waterproofing has been applied on the walls.