The construction and repair works on this site in village of Sokolovo near Balchik include:
- Demolish old tiling;
- Demolish concrete pavement with a drilling machine;
- Load and carry by hand construction waste at a distance of up to 50 m;
- Backfill soil and compact with compaction plate;
- Reinforcing the wall of the pool;
- Supply and install polyethylene membrane;
- Supply and fit rebars;
- Supply and pour concrete with a concrete pump;
- Laying reinforced cement screed;
- Supply and fit patio tiles.
The construction and repair works of fitting stone on a patio of house near Balchik have been completed.
The building works in Sokolovo village near Balchik continue with the supply and fit of stone on the patio around the pool.
The building works near Balchik begin with demolition of the old tiles and demolition of the concrete pavement with drills and pneumatic hammer. The building rubbish is loaded and transported manually with wheelbarrows. Gravel is laid and rammed. The shuttering is made and the reinforcement is fitted for the concrete of the pool. Rebars are fitted, after which the concrete was poured.