The construction and repair works on this house near Balchik include the following works:
- Dismantling of tongue and groove from ceilings;
- Dismantling of gutters and downpipes;
- Dismantling of old fascia;
- Delivery, installation and dismantling of scaffolding;
- Supply and installation of plasterboard suspended ceiling;
- Supply and installation of OSB panels in the attic space;
- Partial repair of walls and ceilings;
- Two coats of gypsum plaster on the walls;
- Supply and priming of walls and ceilings;
- Painting with interior paint walls and ceilings;
- Repair and plaster around new doors and windows;
- Sanding and varnishing of the old tongue and groove from the fascia;
- Supply and fit new tongue and groove;
- Supply and fit new fascia;
- Supply and installation of gutters and downpipes.
The living room, the hallway and all the other rooms in the house are painted. New flooring is installed in the rooms. The building works near Balchik are completed.
The priming of the facade begins and certain parts are taped so they don't get dirty. In the rooms three layers of plaster are applied and then a fine plaster paste is applied. After that the facade of the house has been painted.
Construction works near Balchik continue with uncovering of the roof of the house. The roof is being repaired. Work continues on the wooden cladding of the roof. The installation of the eaves is on the go. Inside the house plasterboard is fitted on construction and underneath insulation of mineral wool is laid. A new metal part of the railing has been made to correct its heigth. First layer of plaster of walls and ceilings is applied, after which the work on the eaves is completed. The metal structure of the railing is painted.
The repair works on this house in Balchik continue with insulation and plastering of the walls of the attic space. OSB boards are mounted on the floor. The installation of the wooden boarding and the fascia begins.
A new electrical panel has been installed. The workers repaired and plastered around the windows. The hallway, the staircase and the kitchen are being plastered. The living room is painted. The fireplace and the fugue of the refractory bricks are painted. Then the kitchen in painted. Wooden sills are installed around the doors.
The repair works in this house near Balchik start with assemble of the scaffold. Around newly mounted doors and windows workers start repairing and plastering inside and outside. Inside, the furniture is covered with nylon and the gypsum plaster of the walls begin.