The renovation works of this house in the center of Varna include:
- Interior works - dismantling of wooden floor and laminate flooring, dismantling of doors, dismantling of plasterboard walls and metal frames, demolition of floor screeding, dismantling of old electrical and plumbing installation, making a new wooden structure on the floor of the apartment, new electrical and plumbing installation, plasterboard for walls and ceilings on a metal frame, supply and fit faience and granite tiles, new screeding, installation of laminate flooring, priming and painting, fitting doors.
- Exterior works - plaster and render of the facade, roof repair.
The construction and repair works of this apartment in Varna have been completed. The roof has been completely repaired. The bathroom is completely ready (new concrete floor, screed, plaster, waterproofing, ceiling, plumbing and electrical installations, fitting faience and terracotta tiles, installed toilet unit, sink and boiler, accessories, tap, etc.). The facade of the apartment has been repaired and plastered. An entirely new electrical installation has been installed in the apartment. The apartment is completely painted inside. Laminate flooring is laid. After the completion of the construction works the apartment is cleaned with an industrial vacuum cleaner.
Primer has been applied before the waterproofing in the bathroom. The new tiles will be glued on top of the old ones (tile over tile). Insulating bitumen tape is installed, as well as thermal insulation of the ceiling in the bathroom. Plaster with reinforcement mesh is applied. The electrical installation has been redone. A new PVC door has been mounted. The cement screed is done. After that, the construction and repair works continue with the laying of waterproofing in the bathroom and fitting faience and terracotta. The suspended ceiling is installed in the bathroom and in the corridor. The roof repair is completed. The corridor is plastered.
The construction works in Varna continue with the installation of beams and wooden floor. Then the aquapanels are installed in the bathroom. The workers make the plumbing in the bathroom and the construction on the wall. Then the reinforcement is laid and concrete is poured by hand for the bathroom's and hallway's floor.
The works begin with dismantling of old wooden floor and demolition of floor screeding.