The building works on this project in Zvezditsa village near Varna include:
- Path behind the house - demolition of tile and concrete flooring, leveling of the place - installation of polyethylene foil and reinforcement, anchoring of the house wall, pour concrete and fitting new tiles;
- Interior works - demolition of granite tiles, leveling floor screeding, gluing of granite tiles, gluing of granite tiles skirting and grouting of corridor and vestibule ground floor, 1st floor, intermediate staircase platform and wardrobe; repair of steps - dismantling of a metal railing, demolition of granite tiles from steps, leveling of the steps, supply and fit of steps from Vratsa stone;
- Living room and outdoor area - dismantling laminate parquet flooring, demolition of tiles on the porch, leveling screed on the porch, self-leveling screed on the living room and porch, dismantling air conditioning, dismantling the sliding door to the porch and two large windows, dismantling of barbecue, repair the wall of the barbecue, delivery and gluing of gneiss on the wall of the outdoor kitchen, dismantling of a false ceiling of plasterboard at a lower level, dismantling and installation of spot lighting and chandelier, supply and fit a new plasterbord with metal frame on ceiling, taking off wallpapers, partial repair of walls and ceilings of the porch and living room, supply and apply primer, painting;
- Repair works and replacement of the Vratsa stone of the fireplace - above the chamber and on the side; - Repair of hydrophore room - demolish flooring and fit a siphon, siphon-sewer connection, washing machine outlets;
- Remove, load and transport building rubbish to a licensed depot.
Painting in the living room is completed. The guest's room is being plastered. The laundry room is also plastered and painted. Scaffolding is raised in order for the staircase to be plastered. Sand and dust will be then removed. Paste will be applied after the plaster. The stone of the staircase is fitted and the doorsteps and sills are shaped from stone.
Granite tiles are fitetd inside and outside. A scaffolding was assembled and another layer plaster is applied. Moldings are installed around the windows. Primer and mineral plaster have been applied and the site is cleaned. Stone is fitted on the steps.
The self-leveling screed is applied when first the surface is cleaned, then primer is applied and then the screed itself is applied. The tiles are fitted and the base is pre-primed with contact primer.
The living room is plastered, as well as the facade of the summer kitchen. An iron sliding gate was made and installed. The fitting of the stone on the parking lot is in progress. Exterior tiles are fitted on the path around the house, as well as stone on the parking lot. Stone panels are mounted on the fireplace and the wall. The floor screeding has been applied in the living room. The old screed is being removed from the hallway. Construction waste has been cleaned.
Mixing and pouring concrete by hand for the paths around the house is in progress. The stone cladding of the fireplace is being demolished, as well as the concrete floor for a new plumbing installation. Plasterboard partition walls are also being demolished. The concrete of the parking place is poured. The plasterboard is fitted on ceilings, walls and concrete beams. The following works have been executed: partial repair of the walls, plaster with fiber mesh, new plumbing in the kitchen and a new construction of the fireplace.
New electrical and plumbing installations are being installed in the bathroom. Waterproofing has been laid and tiles have been fitted. From the outside, insulation is made in the foundations, as well as shuttering for a concrete path around the house. A place for the parking space is marked and the driveway is being prepared for concrete.
The building works on this house in Zvezditsa village start with demolition of the granite tile flooring in the house and on the steps. The plasterboard is dismantled from the ceilings. The concrete pavement around the house and the outdoor fireplace are also being demolished.