The carried out construction and repair work on this project include:
- Building a wall with YTONG;
- New plumbing and electrical installations;
- Laying of waterproofing on walls;
- Laying of thermal insulation on walls in the hallway to the shower room;
- Fitting plasterboard;
- Fitting tiles;
- Bathroom equipment.
The tiles are fitted. The bathroom is equipped with vanity unit, toilet unit, mixing tap, mirror, lights, fan, shower, linear floor siphon and accessories.
The plumbing and electrical installations are done. The plasterboard is fitted on walls and ceiling. Then the tiles are fitted leveling them with spacers.
The works begin with masonry of a wall with YTONG blocks. Then the waterproofing is applied and the plasterboard fitting begins.