The following types of building and repair works were carried out at this site:
- Dismantling works and demolition - removal of tiles and old plaster, dismantling toilet water tank and plumbing, dismantling the boiler, dismantling the electric and old plumbing, dismantling toilet unit and removal of its foundation, dismantling door and its frame, dismantling window, drilling for widening the opening of a window;
- Supply and installation works - supply and install light unit, supply and fit new PVC window 50x50cm (two-sided), supply and fit aluminum door, leveling plaster on the walls, supply and fit tiles on the walls, grouting, adhesive, supply and fit tiles, supply and fit toilet unit and boiler;
- Built-in water installation, re-do old and fit new installation, including drilling floors and walls;
- Re-do of electrical installation, new boiler switch, socket and electricity check.
The repair works in the bathroom are completed. The hallway is also finished.
We're almost done with the repair works. We are finishing the bathroom and works there. The hallway is painted once and is about to be painted one more time. We will finish the project latest on Monday.
Tiles fitting continues. We boxed the main pipe in plasterboard. The plumbing installation is ready. The UPVC window is mounted and soon is to be mounted the door. Next the hallway will be plastered and painted.
We begin the works removing the old tiles in the bathroom. We re-do the plumbing installation and lay new pipes and connections to the main water. Then we start fitting the tiles. The pipes to the washing machine and the kitchen are installed.