This project takes place near Varna and includes the following building works:
- Clear the area;
- Excavate trenches and remove earth by hand;
- Shuttering;
- Reinforcement;
- Lay concrete;
- Lay blocks;
- Wooden panels.
The wooden panels are installed and the perimeter wall near Varna is completed.
The foundations and the concrete part of the wall are poured. We removed the formwork and began building the block wall. The caps are then fitted.
The works begin with taking measures and excavate trenches for the foundations and remove earth by hand. The concrete is also mixed by hand and then we make initial concrete base.