The construction and repair works of this project near Varna include: demolish of concrete flower bed with driling machine, excavate and remove earth, removal and loading building rubbish and earth to a lorry, level surface of the patio/path, supply and fit polyethylene membrane, reinforcement of the path and steps, two sides shuttering of the retaining wall and steps, reinforcement of the retaining wall and the steps, supply and pour concrete for the foundations, retaining wall, steps and path, supply and fit stone tiles for the steps, patio and retaining wall, joints, new windows and doors, repair and plaster around newly fitted windows/doors, primer and paint walls and ceiling.
The patio works are completed. The windows are also mounted.
The concrete is being poured and leveled. The workers have carried the stones for the flooring on site and started installing it.
To ensure easier access and space in front of the house, the works begin with demolition of the flower bed there. The stones and earth are removed, loaded to lorry and disposed. Then the shuttering is fitted. The surface is leveled and the area is reinforced.
This is the condition of the area before the repair works began. There are many sports with worn out and broken wooden frames of the windows and door. The flower bed will be removed and leveled.