The owners of this apartment building in Galata hired Varaks to carry out the following building works on the roof terraces and balconies: removal of the tiles, drill excavate old concrete floor, removal of existing insulation, rubbish removal, supply and lay beton contact primer, supply and fit two types of bitumen waterproof insulation, supply and fit thermal insulation - Styrofoam, supply and fit waterproof membrane prior to concrete, lay new concrete floor with rebar, supply and fit exterior tiles (labour, tiles, adhesive and grout, spacers), fit vent, plumbing and electric wire pipes.
The tiles are fitted and also are the siphons. The terraces are beautifully finished and acquire even more attractive look with the garden furniture placed there. This project near Varna is completed.
The floor screed is finished. The vent pipes are installed. The rubbish and the sand are carried out of the building site. We applied two-component waterproofing insulation before the tiles are fitted.
We lay the second layer of the waterproof insulation - bitumen membrane. The siphons and the drainage pipes are installed. The installation of the heat insulation is in progress. After that the membrane and the reinforcement are installed. The floor screed laying begins.
The screed is applied on the floor and the skirting. The plumbing pipes are installed. The wiring for the lighting units is also ready. The workers start applying two types of bitumen waterproof insulation - firstly flat surface waterproof insulation and above it bitumen membrane insulation.
On this next stage of the renovation of the apartment block near Varna, the roof terraces and the balconies are cleaned and the workers start applying the primer prior to the floor screed. The vent and drainage pipes are replaced.
We are almost ready with the removal of the tiles and the concrete floor. The construction rubbish is gathered and the place is cleaned.
The works begin with removal of the tiles, machine excavate of old concrete floor and removal of heat insulation of the roof terraces. We have assembled a rubbish chute down which the rubbish will be dropped for disposal.