This project near Balchik aims to save the pool clean during heavy rains, as the terrain is sloppy and the rain water goes all in.
Here are the building works which are going to be implemented: excavate trenches, fit drainage pipes, gravel pad under the drainage pipes, pebble stone cover and fittings.
Before we fit the drainage pipes, we put a gravel pad under them. After that it's time to install the pipes. The project is completed with pebble stone, covering the whole trench.
The first thing to do in this project is to excavate the area where the drainage system will be. Then the pipes are going to be fitted.
This is how the pool looks like before the renovation. The plot is a bit sloppy, so in case of rain the pool gets all the rain water. This will be prevented with the drainage.