The repair works in this property include: removal of old fence net and posts, supply and fit new fence net and metal posts with concrete, removal and fit back of old metal side gate, new water shaft, supply and fit new wooden fence with panels and posts, clean and level surface with excavator, level and compact with compaction plate, supply and fit membrane, supply and fit pebble.
The driveway is ready. We have also made a new water shaft. The main gates are also ready. The building works for their mounting iclude: excavation for metal posts foundations, supply and pour reinforced concrete, supply and fit metal posts, supply and fit main gate (4m) with sun decoration.
Next, we supply and fit membrane under the pebble. The river stone is also delivered and laid. Then a compaction plate is leveling and compacting the area. The wooden fence building began. For this purpose the old net and posts have been removed, and the wooden panels and new posts with concrete base are fitted.
The building works in this property in Smin village began with cleaning and leveling the surface with excavator.