In this project in Albena area we carried out the installation of exterior water line. The line connects a building to the mains water supply.
In order to connect the pipes in the plot of this property to the mains, the perimeter wall had to be demolished. Of course, after the installation was done, the wall was restored.
The perimeter wall is ready and the water line project is completed.
The water line has been connected to the existing water supply line, using T-couplers, PVC pipes, risers, sprinkler heads and faucets. The pipes are then covered with the dirt removed from the trench and the dirt has been tamped down. The building of the demolished perimeter wall started with shuttering, reinforcement and concrete for the base.
The works begin with excavation of the trenches for the water line. The workers has placed the dirt along one side of the trench. Part of the perimeter wall needed to be demolished and removed in order to access the inner parts of the property and connect the building pipes with the mains water.