The renovation of the outside area of this complex included the building of a retaining wall, ramp and stairs. Works have been completed quickly with high quality.
Our team has firstly demolished the old concrete, then backfilled with rammer, fit reinforcement bars for the area and lay new concrete. Next thing was to dig the foundations of the retaining wall, ramp and stairs, shuttering and reinforcing them. Once done, the workers laid the concrete, fit the drainage grid, and covered the area with stones.
Thе formwork, reinforcement and concrete pouring of the retaining wall, staircase and ramp are on the go. Workers installed the drainage grid. Then the site is covered with stones. A board of concrete (formwork, reinforcement, concrete) is also made.
At this stage, the supply and fit of the reinforcement grid is on the go. The concrete is also delivered and laid. Works on the excavation of trenches for retaining wall, staircase and ramp began.
The construction works in village of Rogachevo start with demolition of existing concrete. Then we backfill soil and compact, with which we prepare the area for pour of concrete.