The works that needed to be carried out in this apartment included: repair of external chimneys - coating, plastering and painting, repair of the roof - insulating and repairing the leaks, repair and paint of railings, repair works in the bathroom (repair of the leaks, change of siphon and boiler switch), fixing the gutters, repair of plaster internally, repainting the whole apartment, checking and fixing sockets, switches and light units and changing of all internal and external doors.
The walls inside the apartment have been rendered, plastered and painted. The interior and entrance doors have been changed. All sockets, switches and light units are checked and replaced with new ones where needed.
Outside works began with roof insulation, chimney and gutters repair and sand of the railings. Meanwhile, inside the apartment the bathroom's plumbing system under the bath is checked in order to fix the leak. Silicone is applied where needed. Along with it new syphon and boiler switch are fitted.