Industrial building

Building and repair works of a school in Dobrich

Building and repair works of a school in Dobrich

Construction company Varaks has competed the rough construction of a new extension in this school in Dobrich. At the beginning of the construction works, preparatory and dismantling works were done, including assemble of scaffolding and fitting of a mobile fence. The existing concrete pavement, a passage, including walls and concrete, and steps were demolished, and the waste was transported to a depot. A mechanized excavation was done for the new foundations and the excavation was shaped by hand and compacted. Gravel was spread under the pavements.

The professional building workers of building company Varaks have completed all the shuttering, reinforcement and concrete works - including a foundation slab, walls, columns, beams, slabs and a staircase. Part of the structure was built at a height of 4.05 m, with the slab forming a shed. Underlayment concrete and structural concrete were poured with a concrete pump. 

Reinforcement grids and reinforcement bars were fitted. Masonry was completed with solid bricks of various thicknesses. XPS thermal insulation was fitted under the flooring, on the foundations and on the flat roof. Two-component waterproofing was laid on the walls, the foundation slab was also waterproofed, as well as a complete waterproofing of the roof - primer, adhesive, gas-fired waterproofing. 

Old plasterboard structures were dismantled and the building rubbish was loaded and transported. External site works have also been done - filling and compact gravel, as well as the building of a concrete sidewalk around the new part. All construction works have been done in accordance with the project and building standards.

Project details

  • Start Date:08.2025
  • Location:Dobrcih
  • Category: Industrial building
  • ID:I-140