The construction works near General Toshevo will be carried out of two grain warehouses. They include the following types of construction and installation works:
- Grain warehouse 1 - masonry with concrete bricks 15 cm, partial repair of masonry, partial repair of plaster, removal of building waste;
- Grain warehouse 2 - masonry, demolition of concrete pavement up to 20 cm thick, delivery and installation of reinforcing mesh ⌀ 8, delivery and installation of joints, formwork H = 2.50, delivery, transport and laying of concrete with concrete pump, concrete belt on brickwork (includes shuttering, reinforcement, concrete).
The construction and installation works in the grain warehouse near General Toshevo have been completed. The concrete belt is ready. Masonry with concrete blocks also. Panels of LT metal sheets are completely installed.
The double-sided formwork is done, the masonry continues with fence (concrete) blocks, by using 2 auto cherry pickers and 1 hydraulic because of the difficult access. The concrete base is drilled and rebars are laid in it, as well as rebar on the new fields. Concrete is poured and then vibrated. The mounting of the panels оf metal sheets continues.
The masonry with concrete blocks continues in one of the grain warehouses near General Toshevo. The formwork beams and plywood are mounted. The reinforcement is being fitted. Panels of LT metal sheets are installed with the help of a platform of a cherry picker (bucket truck). Holes are cut in the metal columns.
The construction and installation works near General Toshevo begin with the hand demolition of a 30 cm thick concrete pavement. Materials have been delivered (formwork plywood, formwork beams, timber, reinforcing welded nets, fence concrete blocks). Building rubbish is loaded transported. The clearing and dismantling of part of the old masonry and the laying of fence blocks begins.