The project includes the following works:
- Disassembly and dismantling of a public toilet made of aluminum profiles;
- Dismantling of sinks, mixing taps, plumbing, toilets, boiler, lighting, electrical installation, ventilation;
- Demolition of concrete foundation and granite flooring;
- Removal, loading and transportation of construction waste.
The works start with dismantling of sinks and mixing taps. Then the aluminum profiles and lighting are unmounted. The electrical installation works are then started. The granite flooring and concrete base are then demolished.