The compressed air installation works in the mill in General Toshevo include:
- Supply and fit metal pipe 1/2", metal curve, metal curve (eccentric), metal nipple 1/2", metal muffle 1/2", metal t-fitting 1/2", metal pipe-connection 1/2", metal pipe reduction 3/4" - 1/2", metal stop valve 1/2", brackets 1/2", hose Calorfood 120o C, DN 8, hose holders, air guns.
- Supply and fit coupling brass with exit for hose Tedesco, coupling brass with external thread 1/2" for Tedesco hose, nipple with connection to hose Tedesco DN 8, fittings 9mm, W2 10-16.
- Making a borehole in the concrete plate f130.
The compressed air installation is completed and all the required works are done.
Preparing for fitting air guns and make new air pressure installation.