The works implemented here include:
- Unmounting works - unmount of termopanel 40 mm (polyurethane), termopanel 50 mm (insulation), existing metal moulding, doors, old metal frame of the termopanels and unmount of 3 sliding doors;
- Produce, supply and fit - produce, supply and fit of metal frame, suppy and fit termopanes 40 mm and 50 mm, metal frame for the walls in the workshop, metal frame for sectional door type Hormann in the workshop, metal frame for the glass walls, supply and fit new metal moulding, fit 3 sliding doors in the storages, produce, supply and fit of metal columns for support of the walls, produce, supply and fit UPVC windows and doors.
We mounted the termopanel wall, the industrial door and the UPVC windows and doors. The mounting of 3 sliding doors in the warehouses is also completed.
The metal frame wall with termopanes is fitted. The mounting of the sectional (industrial) door in the workshop is in progress. The new metal moulding mounting is also in progress.
The UPVC windows and doors are mounted. Iron doors are also installed.
The works begin with unmounting of termopanel 40 mm (polyurethane), termopanel 50 mm (insulation), existing metal moulding, doors, old metal frame of the termopanels and unmount of 3 sliding doors.