In this project of a mill in Genral Toshevo we are building three ramps and cut openings too. This includes: demolish conrete floor, demolish walls, load to a lorry and transport construction rubbish to a depot, brick masonry, supply and fit gravel, supply and fit polyethylene membrane, supply and fit reinforcement, supply and pour concrete, grind concrete, cut different sizes and shapes holes for the need of the mill.
The project is completed. The three ramps are ready to be used, but before that, we have some other works to finish here.
The old wall openings are closed with brick masonry. The concrete is demolished and the gravel and the membrane laid. The reinforcement is then fitted and the concrete is poured. The work continues with grinding of the concrete.
The works begin with demolition of the walls, cutting openings on the places, where the new ramps will be built. Holes are also cut on the floor.