The construction and fitting works of this mill in General Toshevo include:
- Workshop and storage - unmount and mount of cables in PVC pipes and contactor switches in the storage, cables in PVC pipes and fire sensors on wall in the storage, light units of ceiling at height above 3 m in the workshop, cables in PVC pipes and fire sensors of ceiling at height above 3 m in the workshop;
- Office and laboratory - unmount cables and PVC pipes, outdoor light switches, outdoor sockets, junction boxes and cable split, outdoor light unit of ceiling, EXIT signs and other equipment of walls, fire sensor of ceiling, outdoor light units and connecting to PVC pipes and cable to the existing el.installation.
- Unmount and mount of termopanel 40 mm (polyurethane), termopanel 50 mm (insulation), existing metal moulding, doors, old metal frame of the termopanels.
PVC pipes and cable are connected to the existing el.installation. The old EXIT signs are unmounted and new ones are mounted. New UPVC doors are also mounted.
The fire sensors are then unmounted off the walls. The workers have also unmounted the light units off of the ceiling. Next they started unmounting the termopanels, the existing metal moulding, the doors and the old metal frame of the termopanels.
The works begin taking off the cables, the light switches and the sockets.