Rogachevo village became another favourite place of ours with its beautiful scenery. A worker or two might even mention it was a great pleasure working on such a breathtaking site.
The pipeline is 400 m long and connects a building plot with mains water supply. Despite the sloping site, the project was executed well before the deadline.
The waterline connection was ready in September, when the service saddle, corp stop, compression fittings and control valve were fitted. Fire hydrant is also connected to the main pipe.
The works on this project began with digging the waterline trenches. Then the pipes, fittings and valves were delivered and prepared to be installed.