Building a house in Varna.The building site is located in Varna, near the sea. The project of this new house includes 210 sq.m. total internal area. The ground floor will comprise of open-plan kitchen with living room as well as shower room and storage room. The first floor will have 3 bedrooms and 2 bathrooms.
Outdoor area will offer big garden and parking lots.
Building a house in Varna.
Building company "Varaks" managed to do all the scheduled construction works for this project for March. The building works of this house in Varna continue with the landscaping works, building big retaining walls in the yard, construction of big concrete flower beds at the property boundary, excavation works and instalation of sewerage and rain water plastic tanks, instalation of heating system pipes of the house.
Building a house in Varna
Construction company Varaks' workers made the screed in the entire house. All the building scrap from the building site was loaded and transported to a licensed depo.
The landscaping works have begun.
Construction of a house in Varna.
The weather was pretty cold in January which allows us to do indoor building works only.
The professional workers of construction company Varaks fitted the linear bathroom siphons, laid deep penatrating primer on the concrete floors and fitted thermal insulation "Fibran"on all floors. We also fitted the underfloor heating system.
Next step is to do the screeding in the house.
Building a house in Varna. The weather in December was surprisingly warm and we could fulfill a lot of outdoor building works.
All the walls were plastered using high quality materials.
Varaks construction team finished the roof insulation of the house.
Building a house in Varna. The dedicated team of professionals of building company "Varaks" have installed the el., water and ventilation systems of the house.
Our workers have fitted the thermal insulation of the facade and plaster it after that.
Building a house in Varna.The building works of this house in Varna are ahead of schedule.
In October, building company Varaks have assembled the scafollding, mounted the Al doors and windows, built the extention of the house, built the retaining walls, commenced the fitting works of el. and water instalations in the house.
Our builders have began the facade works of the house - fit and plaster thermal insulation.
Building a house in Varna.
The shell stage of the building is done and the construction works continue with the landscaping works of the property. Varaks Construction company is proud of solving building issues and in this stage of the project - making solid and big supporting walls.
The builders of construction company "Varaks" make the brick masonry of the house in Varna. All the walls are carefully levelled to achieve perfectly levelled surface.
The height of the floor is 3,40 meters and our workers had to assemble scaffolding in order to make the masonry.
Building company 'Varaks" has commenced the insulation works of the north wall of the house, as well as to clear up the building site and preparation for landscaping and retaining walls' works of the property.
Building company "Varaks" has completed the shell stage of the house in Varna. The foremen and builders of our company fulfilled all the requirements of the lead architect and engineers.
During the construction and due to the modern architecture of this house in Varna, all the shuttering and engineering works had to be done according to the very last detail of the project.
The builders remove the shuttering, take it out of the building site and prepare the site for masonry works of the first floor as well as roof insulations.
During the constuction works of this house in Varna, the builders of Varaks Construction managed to do additional supporting works, double shuttering works and fit reinforcements for the roof concrete plate.
The workers of building company Varaks poured the concrete with stationary concrete pump and add supplements of the concrete because of the hot weather.
Special attention to the concrete was paid after the concrete pouring works.
Concrete plate was water sprayed regularly 48 hours after the concrete pouring works.
The building works in May continued with making shuttering, fit reinforcement bars and laying concrete of the first floor concrete plate, make suttering and fit reinforcement bars of the retatining concrete wall and columns of the first floor.
Due fo the difficult access to the building site, the builders cannot use concrete mixer pump but only stationary one. To do this, a scaffolding had to be assembled in order to work with the pump.
The building works continue with brick masonry on the ground floor, shuttering, reinforcement and concrete works of the north side concrete wall of the house, laying concrete, shuttering and concrete works of the first floor concrete plate.
The waterproof and heat insulations of the retaining wall behind the house are also done.
The construction works of this house in Varna are well organised and are on schedule. In March, the workers and technicians of Varaks building company managed to complete the works up to level +3,20m. Water and sewarage system works are also done in level 0. Prior to fitting the shuttering all the shuterring forms were treated with special oil. Due to the narrow street and difficult access to the building site we had to use telescopic wheel loader and stationary concrete pump in order to pour concrete into foundations, concrete plate, columns and concrete walls. Vibration of the concrete was done at concrete pouring. After pouring the concrete, it was treated and polished. The construction works continue with assembling of scafolding. The first layer of bituminous primer was laid onto the supporting wall behind the house.
After a short stop of the works because of bad weather condition the construction works of this house in Varna continue with excavation for foundations. Varaks construction company's technicians give the exact levels of the depth of foundations and contours/perimeter of the house are outlined and marked.
Supply and put gravel and then backfil before we pour the first layer of concrete.
Due to the very restricted and narrow access to the building site we cannot use concrete pumps and lorries.
At this stage we use mini excavator to get concrete from the concrete mixer and carry and pour it.
All the reinforcement bars are carried by hand to the building site too.
The reinforcement fitting works are done and we are ready to pour concrete in the foundations.
The construction works of the house in Varna commence with landscaping the area in order to give enough space for excavation of foundations.