This is a new project of Varaks for construction of a family detached house in the village of Rogachevo, about 5 km away from Albena, Balchik municipality
The building works include rough construction, plumbing and electrical installation, new UPVC windows, finishing works.
This project is ready just on time for the summer. The house is fully furnished inside and the outside works (painting) on the facade are done.
The bedroom furniture has been delivered and mounted. The kitchen is equipped - the cupboards, the extractor and the over are fitted and we are connecting the washing machine. The bathroom is also fitted. We have some works left in the living room. The facade is being rendered.
The works on this house in Rogachevo village are coming to an end. We fitted the sockets and switches. Wallpapers, plaster and paint are applied. The bathroom is equipped and the lighting is fitted.
The floors in the house are tiled and grouted. The bathroom is also completely tiled. We have delivered the boiler and the toilet unit and they are ready to be mounted.
The plumbing and electrical installations are finished. We have also plastered. The bathroom floor tiles are fitted and it is time to grout them now.
The building works continue with fitting tiles in the bathroom. The floor surfaces in the rooms are also laid. The facade is taking shape.
The building works in Rogachevo continue with installation of the plasterboard. The electric and water systems are also being installed.
An outbuilding of a wooden structure for garden equipment was made. The old access door has been closed with brick masonry. An outer wall is partially demolished and a new window is mounted.
At this stage the internal distribution and the foundations for the extension of the house are shaped. Electric and plumbing installations are being installed. The installation of UPVC windows also starts.