The project in Malina village includes the following works:
- Repair of bathrooms - unmount old tiles and plasterboard, floor and walls screeding, drill hole for ventilation, waterproofing, fit new tiles and bathroom equipment;
- Repair of balconies - unmount old tiles, screeding, new tiles;
- New tiles in the underground level kitchen area;
- Supply and fit laminate parquet floor, fit Scotia beading, fittings in the room next to the kitchen;
- Repair of staircase from ground to underground level - plaster and shape stairs and area there, supply and fit exterior tiles, screeding, plaster staircase's walls, primer and paint;
- Supply and fit new metal railings to balcony above entrance and stair entrance and 2 balconies;
- Check el. and re-do plumbing installations;
- New UPVC windows and doors;
- Septic tank building - 3,5 x 3,5 h=5 meters;
- Repair staircase/steps leading to the entrance door - shape stairs with concrete, supply and fit tiles on the stairs, supply and fit exterior tiles on the patio in front of the front door.
The works on this project in Malina village is over. The bathrooms are completely renovated and equipped. Tiles and laminate flooring are laid on the underground floor. The walls of the staircase and the underground floor are primed and painted.
The railings on the balconies and on the external stairs are installed and painted. The internal staircase has been tiled.
The plasterboard in the shower rooms is installed. Then plaster is applied and the tiles are fitted. Bathroom accessories, sink, toilet unit, shower are also fitted. Concrete is poured in the pit with a concrete pump. We make flooring on the terraces and inside. Waterproofing and thermal insulation have been installed in the underground and ground level. Then fiber mesh is fitted and walls are plastered. Electricity and plumbing are made in the underground level. Then the workers repair and plaster around the windows and doors.
The shower rooms are partially tiled. The excavation works for septic tank begin and then the shuttering is done. We work on the el.installation. After that the shower rooms are completed. The plumbing installation is also completed.
The works begin with removal of old doors and windows. Also the removal of the old tiles and plasterboard from the shower rooms begins. Then screeding is applied on the walls. New UPVC doors and windows are mounted.
The house before the repair works begin.