The leak of the bathroom started coming out on the walls in the hallway when the owners of this apartment in Varna contacted Varaks for a building quote.
Full renovation of the bathroom was required - from removal of the plasterboard and old waterproof insulation to fitting new tiles, sink, toilet unit, boiler, toilet accessories. The walls of the living room and the other rooms were also painted.
All the rooms of the apartment have been painted. The ceilings of the balconies, as well. The light units in the house are mounted. The bathroom is fully fitted and ready.
Partial repair of the walls and ceilings is done. This is part of the preparation for painting. Then the primer is laid. The rectangular shower drain is fitted and the bathroom is being tiled. Then we fited the toilet unit, sink, boiler, accessories, shower, glass wall and lights.
The waterproofing of the bathroom's walls and ceiling is installed. The electrical and plumbing system are repaired. We supplied and fitted the plasterboard in the bathroom.
The repair works in this apartment in Varna start with the bathroom and the unmounting of the toilet unit, sink, boiler, accessories, shower. Then the tiles have been removed and the old plasterboard too. The bathroom intermediate wall is demolished. The blinds and the kitchen are unmounted.