This is a new project of Varaks for construction of a family detached house in the village of Rogachevo, about 5 km away from Albena.
The building works include rough construction, plumbing and electrical installation, new UPVC windows, finishing works.
The building works continue with fitting tiles in the bathroom. The floor surfaces in the rooms are also laid. The facade is taking shape.
The building works in Rogachevo continue with installation of the plasterboard. The electric and water systems are also being installed.
An outbuilding of a wooden structure for garden equipment was made. The old access door has been closed with brick masonry. An outer wall is partially demolished and a new window is mounted.
At this stage the internal distribution and the foundations for the extension of the house are shaped. Electric and plumbing installations are being installed. The installation of UPVC windows also starts.